Architecture & Construction

Effective planning is critically important to architects, construction engineers and contractors in any type of construction project. 3D documentation at every stage, from initial design to final inspection, helps avoid costly rework errors.

Architectural practices, construction engineering companies and building contractors have all adopted FARO’s 3D laser scanners for 3D modeling and as-built documentation. Their projects range from simple house construction to inner city renovation and new office construction. From low to high rise, FARO has the right portable 3D solution for you.

Expanding Capabilities with the FARO Laser Scanner

AEC – Construction: AMNEX
Amnex had 2 key requirements when searching for a suitable 3D scanning solution. First, the scanner had to cover a distance range of up to 330 meters. At the same time, data quality was a non-negotiable factor.

Greater BIM Applicability with FARO’s 3D Scanning Technology

Survey and Design: SIPPR Engineering Group Co., Ltd.
Within two short years, SIPPR has deployed FARO’s laser scanners extensively in all phases of its 13 industrial and commercial projects. These include earthwork volume calculation, reverse modeling of factories, testing completed buildings, facade engineering, and calculation of construction materials.

Space Planning Experts Conduct Site Surveys Using the FARO Focus3D – A Professional Laser Scanning Solution to Meet TOZ’s Measurement Challenges

Architecture: TOZ Group
The TOZ team uses the Focus3D to create basic floor plans, and to inspect ceilings and other structures. The accurate results also means that the team no longer need to revisit a site to verify data. TOZ further plans to use the scanner for other purposes such as extracting elevation data and conducting site briefs with the 3D scan data.

Five-fold Productivity in Field Surveys, New Possibilities in VR, & Opportunities Overseas – How the FARO Laser Scanner Changed Poporo Plant’s Business

Plant Engineering: Poporo Plant Co., Ltd
“With the introduction of the FARO Focus3D X 130, our team can now complete the field survey for a plant mechanical room – which is a job that used to take us more than a week with two people on the task – in just one day. This effectively translates to less than one-fifth the effort.”

Register for an Account

This site uses cookies (including third party cookies). Some of these cookies are essential to make our site work properly and others are non-essential but help us to improve the site, including language and location settings and site analytics. You can read more about how we use cookies and how to configure or disable them on our site. By continuing to browse this site you agree to our use of cookies. x